Proper Solar0330 6330 375
    Workplace Charging

    Workplace EV charging, with grant funding in its final year

    Charge staff cars and company vehicles on site. We check your supply, design around it with load management, and handle the Workplace Charging Scheme claim so you get up to £500 per socket off the cost.
    WCS Grant Support
    Minimal Disruption Install
    Aftercare Available

    Why this is the year to do it

    The Workplace Charging Scheme now pays up to £500 per socket for installs completed from 1 April 2026, and OZEV has said this is its final year, closing on 31 March 2027. Surveys, design and grant paperwork take time, so the practical deadline is well before March.

    Benefits for Your Workplace

    Smart charging that works for your organisation

    Staff Retention

    Offer EV charging as a workplace perk. Forward-thinking benefits attract and retain talent.

    Company Car Ready

    Support company car drivers with reliable, on-site charging every day.

    Load Management

    Smart systems balance charging across multiple vehicles without overloading your supply.

    Managed Service

    We can handle maintenance, billing, and user management. Focus on your business.

    Future-Proof

    Install infrastructure now that scales as your team's EV uptake grows.

    Compliance

    OZEV-approved installations meeting all current regulations.

    What a Workplace Charging Scheme Actually Involves

    Workplace charging is the most forgiving commercial scenario there is, because dwell time is long. Staff arrive in the morning and leave in the evening, which gives you eight or nine hours to put energy into a car. That means 7kW AC sockets, occasionally 22kW where a three-phase supply is available and company cars need a mid-day top-up, will cover almost every requirement. Paying for DC in a staff car park is money spent on speed nobody uses.

    The design work sits elsewhere. We survey your incoming supply, check spare capacity on the distribution board, and measure the cable route from the board to the bays you want to serve. Cable run length is usually the single biggest cost variable on a workplace job: twenty metres of surface-clipped SWA along a wall is cheap, and sixty metres across a car park that needs trenching, ducting and reinstatement is not.

    Load management, and why it saves you a DNO application

    Eight 7kW sockets drawing simultaneously is 56kW, which will exceed the spare headroom at most office buildings. Dynamic load management monitors your site's actual consumption in real time and shares whatever capacity is left across the connected vehicles, throttling back during the working day and opening up in the evening. Because staff cars sit still for hours, drivers rarely notice the difference, and you avoid a Distribution Network Operator supply upgrade that could add £10,000 to £100,000 and three to six months to the project.

    Where headroom genuinely does not exist, we say so at survey rather than after the order. In those cases the options are a phased install, a smaller socket count, or a formal DNO application, and we will price all three so the decision is yours.

    Billing, access control and staff policy

    Most employers choose one of three positions: free charging as a benefit, charging at cost, or charging at a small margin. All three are straightforward to run through the back office, using RFID cards or an app to identify the driver. Free workplace charging for employees is not treated as a taxable benefit in kind for cars and vans, which is why it remains a popular retention perk, though you should confirm your own position with your accountant.

    Access control matters more than people expect. Without it, an unrestricted socket in a shared business park becomes a public chargepoint at your expense. We configure whitelists, time windows and per-driver usage reporting at commissioning, and hand you the admin credentials rather than keeping them.

    Grant funding and timing

    The Workplace Charging Scheme covers up to 75% of the purchase and installation cost including VAT, capped at £500 per socket, for up to 40 sockets per applicant across all sites. You must hold off-street parking, and the chargepoints must be installed by an OZEV-authorised installer, which we are. The scheme closes on 31 March 2027, and vouchers have a validity window, so the practical deadline for starting a survey is earlier than the headline date suggests.

    Grants generally do not apply where chargepoints are already mandated by building regulations or a planning condition. If some of your company car drivers take their vehicles home, we can also fit chargers for drivers who take cars home, and you can add solar to cut charging costs.Checked September 2026

    How We Work

    Simple, straightforward process from enquiry to install.

    01

    Site Assessment

    We visit your premises to assess parking, electrical capacity, and understand your requirements.

    02

    System Design

    We design a charging solution that fits your needs, budget, and electrical infrastructure.

    03

    Grant Application

    We help you apply for the Workplace Charging Scheme grant to reduce your upfront costs.

    04

    Installation

    Our commercial team installs your charging infrastructure with minimal disruption to your business.

    05

    Ongoing Support

    We provide maintenance, monitoring, and support. Optional managed service for hands-off operation.

    Keep Chargers Reliable

    Our maintenance packages keep your workplace chargers running smoothly.

    View Maintenance & Support →

    Frequently Asked Questions

    Got questions? We've got straight answers.

    Get a workplace charging quote with the grant shown

    Three short steps. An engineer will call you within one working day, or ring us on 0330 6330 375.

    Step 2 of 3

    Tell us about the site

    Charging for staff and visitors at our workplace

    Ready to Power Your Workplace?

    Get in touch for a free site assessment and grant eligibility check.