Commercial EV charging for businesses and fleets
What are you trying to sort?
Our staff want to charge at work
Our vans need charging at the depot
Our drivers take vans or cars home
We want customers or guests to charge here
Our chargers keep breaking, or our installer's gone
Not sure, we just need some advice
Choose Your Scenario
Every business is different. Pick the scenario that fits yours and get a budget estimate in minutes.
Why Businesses Choose Us
We install, manage and maintain commercial EV charging across Yorkshire, Derbyshire, Sheffield and Chesterfield. Straight-talking advice, honest pricing, and a team that turns up when they say they will.
Whether you need two chargers for a small office or a multi-site fleet programme, we design solutions that work within your electrical capacity and budget.
We handle WCS grant applications, DNO notifications, load management, and ongoing maintenance, so you can focus on running your business.
OZEV
Approved
TrustMark
Registered
WCS
Grant Support
Fuuse
Reseller Partner
How a Commercial EV Charging Project Works
Commercial charging is an electrical infrastructure project first and a chargepoint purchase second. The hardware is the easy part. What determines your cost, your programme and whether the scheme actually works on day one is the supply at your building, the distance from the board to the parking bays, and how honestly the design accounts for how your vehicles are used.
We start every project with a survey of your incoming supply. That means reading the main fuse rating, checking spare ways on the distribution board, and taking a view on your existing maximum demand. A typical three-phase 100A supply has room for a surprising number of 7kW sockets once load management is in place, and almost none if every unit is allowed to draw full power at the same time. Getting that judgement right is what keeps a scheme out of a DNO application.
Sizing the scheme to your dwell time
Dwell time drives charger power more than vehicle size does. A car park where staff arrive at eight and leave at five has nine hours of dwell, so 7kW AC adds around 200 miles across a working day and there is rarely a case for anything faster. A logistics depot where vans return at six in the evening and leave at five in the morning is similar. Trouble starts where dwell is short: shift-change fleets, coach layovers and eHGV turnarounds need DC, and DC is where the cost curve steepens.
We also plan for the sockets you do not need yet. Trenching a duct once and pulling additional cores while the ground is open costs a fraction of returning in two years. Most of our workplace schemes install half the sockets and cable for all of them, which is the cheapest form of future-proofing available.
Grants, compliance and back-office
The Workplace Charging Scheme remains the largest lever for offices and business parks, covering up to 75% of purchase and installation costs to a cap of £500 per socket, for up to 40 sockets, and closing on 31 March 2027. OZEV has said 2026/27 is the final year of the scheme. Depot operators should be looking at the Depot Charging Scheme instead, which works on a much larger percentage of eligible capital cost. The two are scoped differently and cannot be stacked on the same sockets, so the choice needs making before you order hardware.
If any of your sockets will be used by the public, the Public Charge Point Regulations 2023 apply: contactless payment on units of 8kW and above, a 99% reliability standard across your rapid network, transparent pricing in pence per kWh, and a 24/7 free helpline. We specify to that standard by default because retrofitting compliance is considerably more expensive than building it in.
Checked September 2026
Back-office software is the part businesses under-specify most often. Access control, per-driver billing, HMRC-friendly reimbursement reporting and fault alerting all live there. If you run vans that go home with drivers, that reporting is what makes the Advisory Electricity Rate work cleanly at year end.
Who we work with
We install and maintain commercial charging across Yorkshire and Derbyshire, from single-office schemes in Sheffield and Chesterfield through to multi-site fleet programmes. Whether the right answer is four wall-mounted units in a staff car park, a load-managed depot yard, or a mix of on-site charging and driver home installs, the survey tells us, not the brochure.
Commercial EV Charging FAQs
How much does commercial EV charging cost to install?
Most workplace schemes with a handful of 7kW or 22kW AC units land between £1,200 and £2,500 per socket installed, before grant funding. Depot and rapid DC projects start around £25,000 and rise sharply once civils and a DNO supply upgrade are involved. Cable run length, trenching, distribution board capacity and back-office software are the four things that move the number most.
Do we need a DNO supply upgrade?
Not always. Anything under 32A per phase is usually a simple notification. Multiple DC units, or a total load above your existing capacity, triggers a formal application that can take three to six months and cost anywhere from £10,000 to £100,000+. Load management often avoids it entirely by sharing the capacity you already have, which is why we design it in as standard.
Can we charge staff or customers for electricity?
Yes. Commercial units support RFID, app and contactless payment, and you set the tariff per kWh. Workplaces commonly subsidise staff charging as a benefit, while retail and hospitality sites price to cover cost plus a margin. Public-facing sockets have to meet the Public Charge Point Regulations 2023 on pricing transparency and 99% reliability, which we build into the specification.
What grant funding is available for businesses?
The Workplace Charging Scheme covers up to 75% of purchase and installation costs, capped at £500 per socket for up to 40 sockets, and closes on 31 March 2027. OZEV has said 2026/27 is the final year of the scheme. Depot operators should look at the Depot Charging Scheme instead. We check eligibility and handle the paperwork.
How long does a commercial installation take?
From first survey to energisation, a straightforward workplace scheme takes three to six weeks. Add three to six months if a DNO upgrade is required. Groundworks, planning conditions and grant approval windows are the usual causes of delay, so we sequence the DNO application first and work everything else around it.